Home| News| Plasson Large Bore Saddle Training

14 Feb 2017

Plasson Large Bore Saddle Training

Plasson in conjunction with CIVILPIPES conducted installation training on large bore HDPE saddles on site in Marcoola for the Airport Trunk Main Diversion Pipeline. The saddle being welded was to suit 710mm SDR11 HDPE with a 160mm offtake. The saddle supplied by Plasson has a test port incorporated in the saddle to enable a pressure test before cutting into the pipe. The training was very informative and demonstrated how much easier it is to use an electronic scraper instead of a hand pull rotational chain scraper.

Posted in: